Monday, February 2, 2009

Welcome Erin Shakespeare

P&W welcomes Erin Shakespeare as our new Director of Business Development.  Read more about Erin here.  You can email Erin at ess@persakwurmfeld.com.

Thursday, January 15, 2009

Design complete on 102-ft Motor Yacht Refit

102' M/Y Refit

P&W provided new exterior styling of the hull and superstructure on the 102' motor yacht.  The late 1990's yacht offered us some complex and challenging styling issues.  

The new design features a hull extension including new transom structure and storage solutions, new arrangements of fore and aft decks and a new flybridge arrangement with a jacuzzi, wet bar, grill and innovative sliding hardtop.    

Read more and see before and after pictures here.


Wednesday, October 15, 2008

New Design: 144' Motor Yacht

P&W 144'  M/Y
P&W is proud to introduce our new 144-ft tri-deck motor yacht design.  Principle characteristics here.  Please contact us for more information.

Friday, August 15, 2008

Welcome Marc Fournier


P&W is excited to welcome Marc Fournier to our team.  Marc will support our yacht design work and lead our 3D modeling/rending efforts.  A graduate of Savanna College and Art and Design, Marc is a Hobie Cat sailor as well as an avid cyclist, kayaker and aviation aficionado pursuing his pilot's license.  You can email him at msf@persakwurmfeld.com. 

Friday, August 1, 2008

Design Departure: Deos CVRZ

DEOS CVRS

Using our precise 3-D modeling and rendering software P&W completed the design for DEOS silicone CVRZ prototypes. These headphone covers will ultimately be made from a variety of materials including crystal and diamonds. DEOS hired P&W to model the silicone version.  See more: www.persakwurmfeld.com/deos_1.html.  

Friday, July 4, 2008

e33 #14 launches with P&W custom lifting keel

e33 innovative lifting keel
P&W designed this innovative lifting keel for e33 hull #14.  With draft a concern at the owner’s dock, the goal was to design a lifting keel that didn’t negatively impact sailing performance.  

P&W designed a solution that allows this lifting keel to remain totally stable in all positions.

Sunday, June 22, 2008

Panama Canal Pilot Boats




P&W completed engineering today for the re-powering of the Panama Canal Authority's fleet of nineteen 53 foot pilot launches.